SBI PO Prelim Exam Question
If 3 men can finish their work for 8 days, then how many men are needed to finish their work in 6 days? a) 5 Men b) 4 Men c) 8 Men d) None of these
- 20342 Views
- 381 Answers
381 Answers
- What educational qualification is required for this Post?
- some tips to crack SBI po exam
and books for study ?
- What is the syllabus of SBI PO
- I Got 74% Score In Over All Test I Have Given On Your App. Is It Good Marks Or I Need To Improve.
- SBI PO Prelim Exam Pattern
- whether general awareness included in sbi po prelimns or not?
- how should one prepare for SBI po initially through books at most starting level?
- SBI PO PRELIM TIPS SBI PO PRELIM TIPS
- Cheapest generic zomig 37.5mg, zomig usa low price
- How many vacancies are there for SBI PO?
Practice Mock Test
sbi po prelim exam
Number of men * 6 days = 24 man-daysbr /br /Now, solve for the number of men:br /br /Number of men = 24 man-days / 6 days = 4 menbr /br /So, the answer is (b) 4 Men